Rajnath Singh CAPFs Infrastructure Project dispatches At Rs 1,900 crore

  • 2019/03/18 17:51:28
Rajnath Singh CAPFs Infrastructure Project dispatches At Rs 1,900 crore

The Union Home Minister Rajnath Singh was dispatches on 6 march, Wednesday at work on 28  maximum infrastructure work of the police force at central armed force and other organizations costing nearly Rs 1900 crore and spread over 17 states.

Singh additionally established the framework stones for three undertakings of the Land Ports Authority of India at a capacity held here. 

The 28 major works in infrastructure introduced by the home minister had a place with the CRPF, BSF, CISF, ITBP and SSB, other than the Delhi Police and other central police associations, for example, the Land Ports Authority of India, the NDRF and the Central Forensic Science Laboratory.

These infrastructure project, including 71 non-private structures 5,283 private quarters and 34 barracks, built at an all out expense of Rs 1,895.28 crore, are spread crosswise over 17 states at Assam, Kerala, Delhi, Uttar Pradesh, Tamil Nadu, Andhra Pradesh, Maharashtra, Tripura, Bihar, Jharkhand, Madhya Pradesh, Chhattisgarh, Odisha, Telangana, Rajasthan, Haryana and Uttarakhand.

The home minister said the central government has been taking different measures to improve the limit working of the Central Armed Police Forces (CAPFs) and over the most recent five years alone, 1,773 infrastructure projects of the CAPFs have been authorized with a complete cost of Rs 12,060 crore. Next to other 992 projects worth Rs 4,368.93 crore have been finished and the rest of the undertakings are under different phases of development and will be finished in the following 2-3 years, he said.

Home Minister also declared two police station projects to be include at kondli and badarpur has police lines at a police station and 150 staff quarters. Inside the project include 12 projects of four police stations, at two DCP offices, 939 residential quarters, and they completed within two years.

The home minister also provide laid foundation stones for three construction works cost at Rs 66.35 crore with providing accommodation to the border guarding forces deployed on the Indo-Nepal and Indo-Bangladesh borders.

The NDRF work of project includes office and preparing foundation, barracks and 16 private quarters for its eighth contingent at Ghaziabad to be developed in the principal stage at an expense of Rs 99.36 crore. 

The Two Central Forensic Science Laboratories (CFSL) has been built at an expense of Rs 105.79 crore at Bhopal and Guwahati.

Leave a Comment

Read Our Blog

Advantages and disadvantages of Buying and Renting Construction Equipment

Advantages and disadvantages of Buying and Renting Construction Equipment

Advantages and disadvantages of Buying a
Jun 12, 2019

Managing a construction site or maintaining a business, having the correct heavy equipment is required. In any case, there are two manners by which you can Read more...

Upcoming infrastructure projects in India

Upcoming infrastructure projects in India

Upcoming infrastructure projects in Indi
Jun 07, 2019

Read more...

Top 5 Maintenance Tips to Extend Equipment Life and ROI

Top 5 Maintenance Tips to Extend Equipment Life and ROI

Top 5 Maintenance Tips to Extend Equipme
May 28, 2019

Heavy Machinery requires con Read more...

Construction Equipment Rental Market in India

Construction Equipment Rental Market in India

Construction Equipment Rental Market in
May 28, 2019

The construction Equipment has Rental Market that offers subjective data about prevailing trends and an itemized examination of the development direction of this industry. It additionall Read more...